Advanced 더킹 카지노 Engineering (PE) Technology

임시 우물 생산 카지노 사이트고급 더킹 카지노 공학 (PE) 기술

In recent years, aiming for efficient oil and gas recovery, the demand for 더킹 카지노 Engineering (PE), a technology area which covers technologies from well to 더킹 카지노, has increased as a means to pursue improved producwell frome

In particular, the application of IOR and EOR (enhanced oil recovery) to the secondary/tertiary recovery of domestic oil and gas fields and the development of unconventional resources such as shale oil (tight oil) and methanehydrate ideas with multiple disciplines.

JAPEX is currently applying the following PEs mainly to the development and 더킹 카지노 of domestic oil and gas fields.

  • Artificial lift: producing of crude oil using pumps and other machinery
  • Well stimulation: acidizing and fracturing
  • Sand control: application of gravel packs, etc.
Related

Application of Gravel Packs

When producing oil or natural gas from a sandstone formation, sand in the formation may flow into the well with the fluid as production proceeds, causing "sand production failure" that reduces production.

One of the measures to prevent sand 더킹 카지노 is to apply the gravel pack method. As shown in the following figure, this technology prevents sand from entering the well by spreading artificially sized sand (gravels) in the well in the or

well더킹 카지노_gravelpack.jpg

Gravel pack in a high inclined, o더킹 카지노n-hole finishing well

Application of Gravel Packs in the Iwafune-oki Oil and Gas Field

In 2018, the Iwafune-oki oil and gas field in Niigata Prefecture became the first oil field in Japan to apply Openhole gravel packing to the well with high inclination and no casing inserted in the 더킹 카지노 interval.

In the Iwafune-oki oil and gas field, where our subsidiary JAPEX Offshore, Ltd. (JPO) is promoting 더킹 카지노 operations, we have developed an additional 1,900m layer from 2018 to 2019 in 2018 We drilled a highly deviated well in the Iwafune-oki platform, located 4 km offshore from the mouth of the Tainai River in Niigata Prefecture, and applied Openhole gravel packing to prevent sand from flowing into the well. The successful application of result higher-than-expected oil 더킹 카지노.

well더킹 카지노_iwafune2019.jpg

Gravel pack application work at the Iwafune-oki platform

Related
폴더 아이콘

Our website uses cookies to improve the convenience of our visitors when browsing our site. If you agree withour policy on the use of cookies, please click the "Agree" button. If you do not agree to the use of cookies when browsing our website, please disable the cookie setting in your browser.